To find documents not listed on this page, please see specific project pages or use the search feature. If you would like to formally request a document, please contact the Clerk of the Authority at clerk@sfcta.org or 415.522.4817.
SAN FRANCISCO TRANSPORTATION PLAN 2040
The Final Report of this update to the Countywide Transportation Plan (below) was adopted by the Transportation Authority Board on December 17, 2013, and is available for download:
High-res Final Report (15.7MB)
Low-res Final Report (3.5MB)
Appendix A: Revised Outline for Plan Development Process [for information, email: movesmartsf@sfcta.org]
Appendix B: Needs Analysis White Paper (6.3MB)
Appendix C: Core Circulation Study (870KB)
Appendix D: Revenue Assumptions (228KB)
Appendix E: Outreach Summary (981KB)
Appendix F: Transportation Equity Analysis (2.4MB)
Appendix G: Summary of SFTP Policy Recommendations (3.6MB)
Appendix H: Small Project Delivery White Paper (230KB)
Appendix I: Large Project Delivery White Paper (1.2MB)
Appendix J: Plan Performance Summary (145KB)
Appendix K: SF Travel At a Glance (723KB)
[Also see the SFTP web page}
THE COUNTYWIDE TRANSPORTATION PLAN (2004)
- Complete document (PDF, 24MB)
- Download by Chapter: Contents | 1 | 2 | 3 | 4 | 5 | 6 | Appendices
[Also see the CWTP web page]
PROP K REPORTS
- Expenditure Plan 1-Page Summary
- Expenditure Plan Language
- Expenditure Plan and Sales Tax Reauthorization Final Environmental Impact Report
- Current 2009 Strategic Plan (does not include tables and appendices)
- Current 2009 Strategic Plan Appendix A
- Current 2009 Strategic Plan Appendix B
- Current 2009 Strategic Plan Appendix C
- Current 2009 Strategic Plan Appendix D
- Current 2009 Strategic Plan Appendix E
- Current 2009 Strategic Plan Appendix F
- Current 2009 Strategic Plan Appendix G
- Current 2009 Strategic Plan Appendix H
- Current 5-Year Prioritization Programs (FY 2008/09- FY 2013/14)
- Prior 2005 Strategic Plan (does not include tables and appendices)
- Prior 2005 Strategic Plan Tables 1, 2, and 3
- Prior 2005 Strategic Plan Appendix A
- Prior 2005 Strategic Plan Appendix B
- Prior 2005 Strategic Plan Appendix C
- Prior 2005 Strategic Plan Appendix D
- Prior 2005 Strategic Plan Appendix E and approved changes
- Prior 5-Year Prioritization Programs (FY 2003/04–FY 2008/09)
[Also see the Prop K pages and the Prop K Publications page]
CONGESTION MANAGEMENT PROGRAM
The Transportation Authority Board adopted the 2013 CMP on December 17, 2013.
- 2015 CMP Report: Report | Technical Appendices | Staff summary memorandum
- 2013 CMP Report: Report | Technical Appendices | Staff summary memorandum
- 2011 CMP Report: Report | Technical Appendices | Staff summary memorandum
- 2009 CMP Report: Report | Technical Appendices | Staff summary memorandum
- 2007 CMP Report: Cover | Table of Contents | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
2007 CMP Report Appendices: I | II | III | IV | V | VI | VII | VIII | IX | X | XI | XII - 2005 CMP Report: Cover | Contents | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Appendices
- 2006 LOS Monitoring Report
- 2004 LOS Monitoring Report
[Also see the CMP web page]
STRATEGIC ANALYSIS REPORTS
- SAR 15/16-01 Improving West Side Transit Access
- SAR 14-01: Local and Regional Bike Sharing Organizational Models
- SAR 08/09-2: The Role of Shuttle Services in San Francisco's Transportation System
- SAR 08/09–1: Transportation Options for a Better Market Street
- SAR 06-01: Feasibility of Converting Folsom Street to a Boulevard
- SAR 05-01: 16th Street Corridor Transportation Issues
- SAR 05-02: Northeast Waterfront Transportation Issues
- SAR 04-01: Implications of Relocating the Central Freeway Touchdown Ramps
- SAR 02-3: Level of Service Methodologies
- SAR02-2: Balboa Park BART Station Area Parking and Daly City Fast Pass
- SAR 02-1: Transit in the Outer Mission
- SAR98-2: Traffic Impacts in SOMA
- SAR98-1: Multimedia Gulch/SOMA
- SAR 97-3: Traffic Calming
- SAR 97-2: Restricting Private Vehicle Traffic on Market Street
- SAR 97-1: Central Freeway Alternatives
- SAR 96-1: China Basin Ballpark Transportation Issues
- SAR 95-1: Chinatown Congestion and Mobility Issues
- SAR 94-1: Transbay Area Study and Caltrain Downtown Terminal Relocation
[Also see the SARs web page]
Project and Study Reports
See individual project and study web pages. Follow the Quick Links at the bottom of our home page.